Soft pack type LIC
Size: 227 * 170 * 5.5
Single LIC supports a maximum discharge of 500A and can operate in a -40 ℃ environment
Combining high energy and high power characteristics
Excellent low-temperature characteristics
Extremely low self discharge
Long cycle life (over 20000 cycles)
Lifespan: Over 10 years
Discharge capability: Strong
High and low temperature performance: excellent (-40 ℃~+75 ℃)
Security: Excellent
Environmental Protection: Excellent
Reliability: Excellent
Economic feasibility of the plan: Excellent
Scheme economy (lifespan): Excellent
Capacity monitoring: easy to use
Packaging Details
- - Primary packaging: Anti-static PE bags (100pcs/500pcs per bag, based on
capacitor size)
- - Secondary packaging: Anti-static corrugated cardboard boxes
(1000pcs-5000pcs per carton, customized by product model)
- - Custom packaging available (private label, branding, customized carton
size and logo)
- - Labels include product model, capacitance, voltage, batch number,
production date, and shelf life
Shipping Information
- - Protective measures: Anti-static, shock-proof and moisture-proof packaging
to avoid damage during transportation
- - Lead time: 7-15 days for standard products; 15-25 days for customized
products
- - Port of loading: Qingdao/Shanghai/Shenzhen, China (optional based on order
quantity)
- - Incoterms: FOB, CIF, DAP (customizable according to customer requirements)
- - Documentation: Commercial invoice, packing list, certificate of origin,
product qualification certificate
Frequently Asked Questions
Yes—we offer free samples for qualified customers, with freight collect.
Yes—we provide custom specifications for capacitance, voltage, size, pins, and terminals.
We main products include power film capacitors, supercapacitors, lithium-ion capacitors, sodium-ion batteries and other product series.
Our capacitors are widely used in rail transit, new energy vehicles, energy storage, PV/wind power, power supply, aerospace, and military industries.
Standard products: 7–15 days. Customized products: 15–25 days based on specific requirements.